Currency KZT
Asphalt device order in Almaty
Order Asphalt device
Asphalt device
ustrojstvo_asfalta
ustrojstvo_asfalta
ustrojstvo_asfalta

Asphalt device

Reconfirm the price with seller
Seller
Kazakhstan, Almaty
(View map)
Description

Improvement of the territory – the important stage finishing any construction. Installation of an asphalt covering and installation of curbs have to be made by professionals, then the customer will receive durable asphalt concrete which will be comfortably operated, without the need for frequent repair or fast replacement.

Specialists of our company possess long-term experience of laying of asphalt in the yards, on parkings, building sites and other objects. Thanks to qualitative materials from manufacturing plant and special equipment, the hard coating conforms to standards and requirements.

To estimate work of contractors, the customer needs to know technological features of laying of asphalt and to be guided in this process.

First of all there is a planning and a marking of the territory:

  • the plan scheme of object is created;
  • sites on which asphalt will be laid are marked;
  • installation sites of borders are noted;
  • drains and stormwater drainages are marked.

Depending on tasks which will be carried out by a hard coating of the territory and the mode of operation – the composition of materials is selected: thickness of a layer of the basis and quantity of layers of asphalt.

For example, there will be enough one layer of asphalt for laying of a covering in the pedestrian zone:

  • yards;
  • sidewalks;
  • parkings etc.

The layer of crushed stone makes not less than 10-15 cm, and asphalt – 4-5 cm.

Asphalt – building material from mix of bitumens (artificial and natural pitches) with sand and crushed stone. For the organization of a hard coating and transport ways use asphalt concrete – stronger structure where sand, crushed stone with a mineral filler mixes up with the knitting bitumen.

Formation of asphalt happens step by step:

  • the top layer of the earth is removed (asphalt has to be flush with a land covering);
  • the earth is stamped by the vibrating plate or a skating rink;
  • then gravel of the different size keeps within (depends on purpose of a covering);
  • as the top layer always serves asphalt which is important for ramming warmed.

Our services are an observance of technologies of laying, the qualified selection of materials and 10 years of operation of asphalt.

All detailed information on the website www.landscape12.kz – or by the specified phones. Call!

Contact the seller
Asphalt device
Asphalt device
Compare0
ClearSelected items: 0