Services of other enterprises
Description
Construction of baths
Production and construction of houses from sip-panels.
Prefabricated house from a sandwich of panels on SIP technology without finishing. Type - mansard. The term of assembly is 7-30 days. In house cost
enters: Installation, external walls, a bearing wall indoors, internal partitions, inter-storey overlapping, a roof (threw -
tile), base. Is not included in the price of the house: internal and exterior finish, windows, doors
High seismic stability, heat resistance, environmental friendliness
CHARACTERISTICSThe main | |
---|---|
Building type | Monolithic with a fixed timbering, Multystoried, One floor, Two floor, Mansard, the Townhouse |
Types of buildings on material | Frame, Combined, Monololitny, Gas-block, Stone, Brick, Yacheisto - concrete, Thermoblock, Wooden |
The choice of the rendered services | Repair, Construction |
Type of wooden material | The pro-thinned-out log, Bar, the Pro-thinned-out bar, Log |
Contact the seller
Construction of baths