- Country of manufactureChina
Power level pass hydroelectric power station directly depends on conditions in which its hydrotechnical properties are:
1. The consumption of water is the that volume of water masses (l) which passes through the turbine for a certain period. It is accepted to take for this interval 1-2 seconds.
2. A water pressure – distance between two opposite points of water weight (one is located above, another in the lower part). The pressure has a number of characteristics on which also types of micro hydroelectric power station (a high pressure, an average pressure, a low pressure) depend
Some characteristics of the technical plan:
1. Height difference: 50 — 1700 m
2. Water expense: 0,03 — 13 cubic meters per second
3. Power: 5 — 3 000 kW
4. Number of the shovels located on the axial sector: 37
5. EFFICIENCY: 84% — 87%
The application on pass the hydroelectric power station can send to mail or to tell by phone.
Surely – a pressure and a water consumption. Let's discuss details, we will put an optimal variant.