Currency KZT
Hydroelectric power buy in Almaty
Buy Hydroelectric power
Hydroelectric power
gidroelektroenergiya
gidroelektroenergiya

Hydroelectric power

Custom order, 60 days
Price:
10000 KZT
Shipping:
Seller
Kazakhstan, Almaty
(View map)
Technical characteristics
  • Country of manufactureChina
Description

Power level pass hydroelectric power station directly depends on conditions in which its hydrotechnical properties are:

1. The consumption of water is the that volume of water masses (l) which passes through the turbine for a certain period. It is accepted to take for this interval 1-2 seconds.

2. A water pressure – distance between two opposite points of water weight (one is located above, another in the lower part). The pressure has a number of characteristics on which also types of micro hydroelectric power station (a high pressure, an average pressure, a low pressure) depend

 

Some characteristics of the technical plan:

 

1. Height difference: 50 — 1700 m

2. Water expense: 0,03 — 13 cubic meters per second

3. Power: 5 — 3 000 kW

4. Number of the shovels located on the axial sector: 37

5. EFFICIENCY: 84% — 87%

The application on pass the hydroelectric power station can send to mail or to tell by phone.

 Surely – a pressure and a water consumption. Let's discuss details, we will put an optimal variant.

Contact the seller
Hydroelectric power
Hydroelectric power
Shipping method
Compare0
ClearSelected items: 0